Adding a COSHH Assessment to a Risk Assessment & Method Statement

Modified on Wed, 4 Sep, 2024 at 9:03 AM

A COSHH assessment can be added from the Review page for a RAMs document.

 

Below the “Risk Assessment and Method Statement” section, there is a “COSHH Assessments” section. To add a COSHH assessment to the RAMs document, select the “Add COSHH” button. 


 

               Graphical user interface, application, Teams

Description automatically generated with medium confidence


 

The COSHH Assessment module will load showing all the COSHH assessments created within the system. Existing COSHH assessments can be selected using the actions button at the top right of their cards. Selecting the action button will load a menu, to use an existing COSHH assessment, select the “Review” action. 

 

NOTE: If the COSHH assessment has not already been created, a new COSHH assessment can be created using the “Create New COSHH” button above the existing assessments. 


 

          Graphical user interface, application

Description automatically generated


 

If an existing COSHH assessment has been selected, it is recommended the assessment should be reviewed. This can be done by selecting the action button on the right, then selecting edit. This will allow the four steps to be reviewed, as some details may need to change for this specific RAMs document. E.g. location of substance use. 


 

          Graphical user interface, application, Teams

Description automatically generated


 

To return to the RAMs document review page, select the "Link COSHH to RAMs document" button at the top right of the COSHH review page.



 

The COSHH Assessment will then appear on the RAMs document review page and be part of the document when it is emailed or downloaded. 


 

              Graphical user interface, application

Description automatically generated



Was this article helpful?

That’s Great!

Thank you for your feedback

Sorry! We couldn't be helpful

Thank you for your feedback

Let us know how can we improve this article!

Select at least one of the reasons
CAPTCHA verification is required.

Feedback sent

We appreciate your effort and will try to fix the article